Felton's Sidewalk Project Ends at Graham Hill Road, Where Downtown Begins

Caltrans is building a sidewalk on the southbound side of Highway 9 from the Graham Hill Road intersection to the San Lorenzo Valley Schools Complex. The sidewalk will be 6 feet wide where there's room and at least 4 feet where right-of-way is tight. The project also adds a cyclist shoulder at least 4 feet wide, new retaining walls, curb and gutter upgrades, and a new bus pad at San Lorenzo Valley High School. According to the Caltrans project page, construction should be done by August 2027, and winter weather could push that date back.

Locally it's called "the sidewalk project," and the name tends to stop at the school. Look at where it ends, though. The south end sits at the light at Graham Hill Road and Felton Empire Road, which is where downtown Felton starts. Once it's finished, the high school campus at 7105 Highway 9 and the village shops in the 6200 block will be connected on foot for the first time.

Seventy years on a shoulder

In its October 15, 2026 traffic release, Caltrans described the problem plainly. Ever since San Lorenzo Valley High School opened in 1954, people walking to it have had to use the narrow shoulders of Highway 9. The same release calls the project a sidewalk and bikeable shoulder "between the schools complex and Felton's downtown." That phrase reads both ways. A student can walk down to the village, and anyone in the village can walk up to the campus.

The formal planning took years. In 2019, Santa Cruz County announced alternative-route signs and crosswalk work near the schools. Then-Supervisor Bruce McPherson and SLVUSD Superintendent Laurie Bruton spoke publicly about student safety, and the county held a community meeting with Caltrans, the Regional Transportation Commission and County Public Works. The same year, the RTC adopted the Highway 9/San Lorenzo Valley Complete Streets Plan on June 27, 2019. Public input for that plan had been gathered from 2017 to 2019.

Construction followed the funding, which came through the state. Caltrans lists the project under the State Highway Operation and Protection Program, with a programmed capital cost of $8,494,000. The RTC's project update for its October 1, 2026 board meeting gives different figures: $5.8 million for construction capital and $17.6 million in total. The two agencies use different categories, so the numbers can't be compared directly. The same update names Granite Rock Company as the contractor.

Why the barrier sits at the busy end

Drivers notice the south end of the project first. A temporary concrete barrier closes one southbound lane as Highway 9 approaches Graham Hill and Felton Empire Road. Caltrans says the crews working behind it need that protection for every current phase of work, and it expects the barrier to stay through February 2027.

The work behind the barrier explains why it's there. For the week of October 19, Caltrans listed concrete pours from 4 a.m. to 6 a.m. under one-way reversing traffic control north of Graham Hill Road, retaining wall forms at post mile 6.5, and curb and gutter work for the new sidewalk and driveways from Clearview Road to north of Fall Creek Drive. The RTC update says some overnight one-way reversing traffic will be needed, but at least one lane in each direction will stay open during the day.

Not all of the work is visible. In February 2026, the Press Banner reported gas-line relocation along the corridor, along with daytime and overnight traffic controls.

The dates are useful for planning because the barrier comes down well before the project ends:

Milestone Date Source
Construction start on Caltrans schedule July 2026 Caltrans project page
Southbound lane barrier near Graham Hill Rd expected to end February 2027 Caltrans, Oct. 15 release
Estimated completion August 2027 Caltrans project page

The RTC update says the contractor started some construction activities in May, earlier than the July date on the Caltrans page. The August 2027 finish is the same in both. If the schedule holds, most of the lane squeeze happens through this winter, and the last six months or so of work happen with traffic moving more normally.

What sits at the downtown end

Treat the Graham Hill Road intersection as the sidewalk's front door. Here's what's within a short walk of it:

  1. Wild Roots Market, 6240 Highway 9. It's the village grocery, open daily from 9 a.m. to 9 p.m., according to Visit Santa Cruz County. Some people still call it New Leaf. The San Lorenzo Valley Post reports that the store ran as New Leaf from 1991 and became Wild Roots in 2017.
  2. The Grove Cafe and Bakery, 6249 Highway 9. It's a few doors down, serving food on the hours listed on its own site.
  3. Felton Music Hall, 6275 Highway 9. The hall's fall calendar is busy. The Santa Cruz Sentinel covered Jerry Douglas's October 21 show at the hall.
  4. Felton Covered Bridge County Park, Graham Hill Road at Mount Hermon Road. The park has river access, a playground and a pump track, and it's open sunrise to sunset, according to County Parks.
  5. Felton Branch Library and Felton Discovery County Park, 6121 Gushee Street. The library and park share an address. The park has a playground, a multi-use trail and a spot for viewing Bull Creek, and it's open sunrise to sunset. The library is open on most days of the week.
  6. The Fall Creek unit of Henry Cowell Redwoods State Park. Its trailheads are marked along Felton Empire Road off Highway 9, according to California State Parks. That's the same intersection where the new sidewalk ends.

Walking from the school pickup line to the grocery, the bridge park or the Fall Creek trails has meant using a highway shoulder until now. Once the project is done, those trips will start or end on a sidewalk.

The schools end gets its own changes

At the north end, Caltrans plans a new bus pad at San Lorenzo Valley High School. The cyclist shoulder, at least 4 feet wide, runs the length of the project. The RTC lists the limits as post miles 6.3 to 7.2, which is under a mile of highway. That's walkable in any season, but for seventy years it hasn't been comfortable to walk.

The campus also hosted the public conversation about the project. Fifth District Supervisor Monica Martinez held a town hall on October 22 in the Performing Arts Center at SLV High. Caltrans covered the project's history, current status and upcoming timelines, and gave an overview of other San Lorenzo Valley projects. Representatives from San Lorenzo Valley Unified and the Regional Transportation Commission also took part. The SLV Post's preview said the meeting would stream on Supervisor Martinez's Facebook page and that a recording would be posted afterward. The RTC's event page also said a recording would follow.

This Saturday, the village is the destination anyway

The first test of downtown Felton as a walking destination comes before the sidewalk is finished. Downtown businesses in Felton and Boulder Creek are taking part in Trick-or-Treat Street on Saturday, October 31, from 5 to 7 p.m., according to the San Lorenzo Valley Post's Halloween roundup. If you're coming from north of the intersection, the barrier will still be in place on the southbound approach. Give yourself extra time, as Caltrans asks, and plan to park and walk inside the village instead of driving up the highway shoulder.

For weekly updates, Caltrans District 5 posts Highway 9 traffic-control notices every week, including overnight pour windows, through its news releases. The overall schedule is on the project page. Those are the two dates that matter for planning: February 2027 for the barrier and August 2027 for the finished sidewalk.

I grew up with this stretch of Highway 9, and I'm glad to talk about what the sidewalk changes, from getting kids to the village after school to how a home near either end fits into daily life once the project is done. If that's on your mind, Danny Ward is happy to talk it through. Let's Connect.